Site Logo
Works complete on The National Gallery’s ‘One Accommodation Hub' in London’s iconic Trafalgar Square
‘One Accommodation Hub', The National Gallery, Trafalgar Square, London
‘One Accommodation Hub', The National Gallery, Trafalgar Square, London

The project work by multidisciplinary firm HDR saw a full remodelling of the northeast part of the Grade I-listed National Gallery building.

The project helps provide much needed office accommodation for The National Gallery’s unique space in the middle of central London.

HDR has been a Service Consultant for The National Gallery for over 30 years, and 2021 saw the completion of its largest project to date; the One Accommodation Hub. The world-renowned National Gallery is in London’s iconic Trafalgar Square, a public square in Westminster that features some of London’s top attractions. The gallery required much needed office accommodation in the centre of the Trafalgar Square Wilkins building.

The project work saw a full remodelling of the northeast part of the Grade I-listed National Gallery building, creating office space for 250 existing staff members in the form of a seven-floor internal courtyard office development, located in the section that formed part of the original Barry extension 1876 building. The development of the space was achieved by constructing a new seven storey tower block in one of the building’s last existing lightwells, converting the tiered ground floor and carrying out a wholesale remodelling of the historic E M Barry north building.

HDR was involved in the surveying and redesign of all MEP services through to completion.

The new, modern office space has provided substantially improved facilities that offer enhanced capability for flexible working and collaboration, proving to be a great benefit to the gallery’s existing workforce.

Part of the project work required HDR to assess the impact of the new CIBSE Covid-19 ventilation guidance. The design – which was put forward in 2017 – proved so robust it allowed the firm to keep all the installed ventilation, with no need to suspend the use of any item of plant or components. It could be said that HDR’s plant design was already Covid-19 compliant before the CIBSE guidance was published.

HDR’s review of the world-famous gallery also looked at fresh air improvements. As the atrium spaces are fresh air ventilated, it enables surrounding offices to have additional fresh air movement, making the new building light, airy and fully Covid-19 compliant.

The project team included:

Main contractor/fit-out and refurbishment contractor – Willmott Dixon Interiors
Architect – Purcell
Structural engineer – The Morton Partnership
Quantity Surveyor and Commissioning Manager – Faithful+Gould
Fire Consultant – IFC
Planning Consultant – Montagu Evans
Acoustic Consultant – Waterman Acoustics

About HDR Inc.
HDR Inc. is a leading independent multidisciplinary engineering consultancy, providing solutions for the built environment. Its core businesses encompass; Transport, Water, Resources, Defence, Architecture and Building Services Engineering.In 2019 Hurley Palmer Flatt Group joined HDR Inc and together the two firms represent more than 10,000 employees in over 200 locations around the world.Previous notable commissions in the Arts sector include the Guildhall School of Music, the National Theatre and the Barbican Arts Centre.

https://www.hdrinc.com/

Login / Sign up